QA-07 (Connect): Last- & Leistungstest #314

Closed
patrick wants to merge 0 commits from feature/qa-07-last-leistungstest-connect into main
pull from: feature/qa-07-last-leistungstest-connect
Owner

Lasttest fuer Connect unter realistischer Last aus ERP/DATEV/M365 gleichzeitig.

Durchgefuehrte Pruefungen:

  1. Credential-Abruf unter Last (30 Instanzen, 100 parallel, 3000 Aufrufe) -- BESTANDEN: 0 Fehler, 11103,1/s (Ziel >=1000/s), p95 15,4ms (Ziel <=30ms)
  2. Sync-Job-Queue unter Last (300 Jobs, 20 Worker) -- BESTANDEN: 0 Doppelverarbeitung, keine Verklemmung, 1026,8 Claims/s
  3. Rate-Limiting unter Mehrinstanz-Last (9 Instanzen, 3 Typen) -- BESTANDEN: alle unter erlaubtem Maximum, Typen unabhaengig

Kein Merge, kein Deploy -- zur Pruefung bereit.

🤖 Generated with Claude Code

Lasttest fuer Connect unter realistischer Last aus ERP/DATEV/M365 gleichzeitig. **Durchgefuehrte Pruefungen:** 1. Credential-Abruf unter Last (30 Instanzen, 100 parallel, 3000 Aufrufe) -- BESTANDEN: 0 Fehler, 11103,1/s (Ziel >=1000/s), p95 15,4ms (Ziel <=30ms) 2. Sync-Job-Queue unter Last (300 Jobs, 20 Worker) -- BESTANDEN: 0 Doppelverarbeitung, keine Verklemmung, 1026,8 Claims/s 3. Rate-Limiting unter Mehrinstanz-Last (9 Instanzen, 3 Typen) -- BESTANDEN: alle unter erlaubtem Maximum, Typen unabhaengig Kein Merge, kein Deploy -- zur Pruefung bereit. 🤖 Generated with [Claude Code](https://claude.com/claude-code)
patrick added 4 commits 2026-10-16 15:14:34 +02:00
AC1: Shared loadtest-Harness (eigene Kopie, connect ist eigenes Go-Modul) plus Lasttest fuer Store.Get() gegen echte Postgres-Testdatenbank: 3000 Aufrufe, 100 parallel, 30 Connector-Instanzen, 0 Fehler, p95=15.4ms (Ziel <=30ms), 11103.1 Get()/s.

Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
AC2: 300 Sync-Jobs (ERP/DATEV/M365 gemischt), 20 parallele Worker claimen gleichzeitig ueber Store.ClaimDue gegen echte Postgres-Testdatenbank. Ergebnis: 300/300 Jobs exakt einmal geclaimt, keine Verklemmung (Claim-Phase 292ms, 15s-Waechter nicht ausgeloest), 1026.8 Claims/s.

Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
AC3: 9 Connector-Instanzen (ERP/DATEV/M365, je eigenes Limit), je 10 parallele Goroutinen haemmern 3s gleichzeitig auf Limiter.Wait. Ergebnis: alle Instanzen unter ihrem erlaubten Maximum, Limits bleiben unter Last proportional zur Konfiguration eingehalten, unabhaengige Instanzen blockieren sich nicht gegenseitig.

Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
QA-07: last leistungstest
CI / Web-Barrierefreiheitspruefung (axe, Tastatur, Reflow, Textabstaende) (push) Canceled after 0s
CI / Web-Barrierefreiheitspruefung (axe, Tastatur, Reflow, Textabstaende) (pull_request) Canceled after 0s
CI / Core-Modul (Build/Vet/Test) (push) Canceled after 0s
CI / DMS Security-Test-Gate (AC5, Merge-Gate) (push) Canceled after 0s
CI / Connect Security-Test-Gate (QA-01 AC4, Merge-Gate) (push) Canceled after 0s
CI / DMS-Modul Supply-Chain-Scan (govulncheck) (push) Canceled after 0s
CI / Web (dms-browser) (push) Canceled after 0s
CI / Web (pdf-viewer) (push) Canceled after 0s
CI / Web (shl) (push) Canceled after 0s
CI / Core-Modul (Build/Vet/Test) (pull_request) Canceled after 0s
CI / DMS Security-Test-Gate (AC5, Merge-Gate) (pull_request) Canceled after 0s
CI / Connect Security-Test-Gate (QA-01 AC4, Merge-Gate) (pull_request) Canceled after 0s
CI / DMS-Modul Supply-Chain-Scan (govulncheck) (pull_request) Canceled after 0s
CI / Web (dms-browser) (pull_request) Canceled after 0s
CI / Web (pdf-viewer) (pull_request) Canceled after 0s
CI / Web (shl) (pull_request) Canceled after 0s
Core-Schnittstellen-Vertragstests / contract-tests (pull_request) Canceled after 0s
Supply-Chain-Scan (Go) / govulncheck (pull_request) Canceled after 0s
Supply-Chain-Scan (npm) / npm-audit (pull_request) Canceled after 0s
RBAC-Rollenhierarchie-Pflichtgate / rbac-policy-invariant (pull_request) Canceled after 0s
Core-Pflichttest-Gate / pflichttest-gate (pull_request) Canceled after 0s
CI / DMS-Modul (Lint/Build/Test/Coverage/Artefakt) (push) Canceled after 0s
CI / DMS-Modul (Lint/Build/Test/Coverage/Artefakt) (pull_request) Canceled after 0s
4e2c766dad
Pruefprotokoll mit allen drei Pruefungen (Credential-Abruf-Latenz, Sync-Job-Queue ohne Verklemmung/Doppelverarbeitung, Rate-Limiting unter Mehrinstanz-Last) und konkreten Messwerten gegen eine echte Postgres-Testdatenbank auf Host 204.

Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
Author
Owner

Inhalt bereits in main enthalten (geprueft per merge_all_prs.sh: leerer Merge-Diff). Geschlossen ohne Merge.

Inhalt bereits in main enthalten (geprueft per merge_all_prs.sh: leerer Merge-Diff). Geschlossen ohne Merge.
patrick closed this pull request 2026-10-19 12:29:45 +02:00

Pull request closed

This pull request cannot be reopened because the branch was deleted.
Sign in to join this conversation.
No Reviewers
No labels
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: scripte/nexarch#314