Files
talktime/features/INDEX.md
T
patrickandClaude Sonnet 5 4cb2284ad9 docs: spec PROJ-12 — automatic retention-based deletion for left members (GDPR)
Configurable per-organization retention period, daily job, reuses the
existing hard-delete path from PROJ-3 instead of introducing a new one.

Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_0143yYvjesjHndBACoweyK67
2026-09-11 18:47:59 +02:00

2.6 KiB

Feature Index

Central tracking for all features. Updated by skills automatically — never hand-edit the status column without also updating the matching feature spec header.

Status Legend

  • Planned - Requirements written, ready for architecture
  • In Progress - Tech design done, frontend/backend being built
  • In Review - QA testing in progress
  • Deployed - Live in production

Features

ID Feature Status Spec Created
PROJ-1 Auth (Login/Logout/Session) Deployed PROJ-1-auth.md 2026-09-11
PROJ-2 Verein anlegen + Vereinsadministrator Deployed PROJ-2-verein-und-vereinsadministrator.md 2026-09-11
PROJ-3 Mitgliederverwaltung Deployed PROJ-3-mitgliederverwaltung.md 2026-09-11
PROJ-4 Abteilungsverwaltung Deployed PROJ-4-abteilungsverwaltung.md 2026-09-11
PROJ-5 Mannschaftsverwaltung (inkl. Saison) Deployed PROJ-5-mannschaftsverwaltung.md 2026-09-11
PROJ-6 Rollen & Berechtigungen (RBAC) Deployed PROJ-6-rollen-und-berechtigungen.md 2026-09-11
PROJ-7 Einladungssystem Deployed PROJ-7-einladungssystem.md 2026-09-11
PROJ-8 Audit Log Deployed PROJ-8-audit-log.md 2026-09-11
PROJ-9 Synapse-Integration (Health Check, User Provisioning, Raum-Sync) Deployed PROJ-9-synapse-integration-health-check.md 2026-09-11
PROJ-10 Deployment (Docker Compose + Synapse Installer) Deployed PROJ-10-deployment.md 2026-09-11
PROJ-11 Chat (Matrix Client-Server API) Planned PROJ-11-chat.md 2026-09-11
PROJ-12 Automatische Löschfrist für ausgetretene Mitglieder (DSGVO) Planned PROJ-12-mitglieder-loeschfrist.md 2026-09-11

Noch nicht gestartet (siehe docs/PRD.md Core Features): dedizierte Tenant-Isolation-Tests. P2 (Medien-Anhänge, Push) bewusst aus PROJ-11 ausgeklammert, siehe dessen Non-Goals.

Nachträge 2026-09-11 (commit bc4d749): Passwort-Reset → PROJ-1, Mitglied hart löschen → PROJ-3. Nachtrag 2026-09-11 (commit ffe2d45): API-Zugriff bei suspended/left sofort entziehen (nicht nur Matrix) → PROJ-3.

Next Available ID: PROJ-13